Sunridge Gold Corp. announces that recent drill results from the Emba Derho copper-zinc-gold deposit have extended the known mineralization and intercepted significant widths and grades.
The 5,000 meter diamond drill program has provided new assay data, additional geo-technical data, and metallurgical samples to be used in the ongoing pre-feasibility study that includes Emba Derho and the nearby Adi Nefas and Gupo Gold deposits. These three deposits make up the Asmara North project, part of the Asmara Project, Eritrea. Emba Derho is a large volcanogenic massive sulphide deposit that has a surface gold zone underlain by zinc and copper zones.