Banner


Infill drilling still continues to encounter thick intersections of copper-silver mineralization along the North Limb of the Banana Zone PDF Print E-mail
Tuesday, 12 July 2011 11:59

Hana Mining Ltd. announced its most recent drilling results from the completion of 10 infill diamond drill holes in the Banana Zone at its Ghanzi sediment hosted Copper-Silver Project in Botswana.

Infill drilling was carried out on the North Limb area (between sections 66075 to 66825 at North Limb North) to convert a substantial amount of the NI 43-101 compliant resources within this area into the Indicated category from the Inferred category.

These results are from new holes and are in addition to those used in the most recent NI 43-101 compliant Inferred mineral resource calculation. The mineralization remains open at depth.

Highlights of recent drilling results:

The latest results confirm the continuity of copper-silver mineralization at the North Limb North area of the Banana Zone.

Intercepts of:

  • 1.32% Cu and 31.1 g/t Ag over 5.8 metres within a wider mineralized interval of 0.72% Cu and 15.0 g/t Ag over 21.1 metres in hole HA-296-D,
  • 0.91% Cu and 23.0 g/t Ag over 8.4 metres within a wider mineralized interval of 0.60% Cu and 12.0 g/t Ag over 20.9 metres in hole HA-298-D,
  • 0.85% Cu and 17.0 g/t Ag over 11.8 metres within a wider mineralized interval of 0.57% Cu and 11.0 g/t Ag over 19.5 metres in hole HA-307-D, and
  • 1.64% Cu and 37.0 g/t Ag over 5.0 metres within a wider mineralized interval of 0.78% Cu and 17.0 g/t Ag over 14.1 metres in hole HA-297-D.

More information, click here

Bookmark this page!
Ask.com del.icio.us Digg.com Facebook folkd.com Google Hao Hao Report Netscape StumbleUpon Technorati Webnews Mister Wong Yahoo

 



Stay informed, receive our monthly newsletter!

We have 458 guests online

Mining Reporter Portal - The International Journal for Mining, Tunnelling, Equipment and Technology - Made in Germany
http://www.dmt.de
tunnel construction boring machine tunnelling  shaft sinking machines drilling horizontal mechanized Schwanau traffic
http://www.cft-gmbh.de
http://www.emp-antriebstechnik.de
Spezialmaschinen und Komponenten fuer Anwendungen im Berg- und Tunnelbau
RAG Mining Solutions
http://www.indurad.com
LHD-Loader PFL - payloads 1,5 t - 5,5 t  - optimum solution mining tunnelling
moduscom manfred koenig, marketing - internet - print - communication - for the mining industry
Cool Air and a Fresh Breeze in Mining and Tunnelling - We care for You - Tunnel-Ventilation.de
China International Forum and Epo on Coal Industry 2012
Cool Air and a Fresh Breeze in Mining and Tunnelling - We care for You - Herco-gmbh.com
vge-strata-control-in-in-seam-roadways german deep coal mining expertise
http://www.dh-shaftsinking.com
Self-propelled working platform and standard telescopic-swivel loader combined in one machine
Tools for drilling and rockbolting Drill bits Drill rods Drill shanks Drag bits Sleeves and adapters
PC-Soft GmbH is positioning itself on the market as one of the first and leading providers of integrated software
13th annual CHINA MINING Congress & Expo
http://www.kirchgaesser.de
21th International Symposium on Mine Planning and Equipment Selection (MPES 2012), SWEMP 2012, 28-30 November 2012,New Delhi, India
A world-leading provider of equipment and services for the mining and construction industries. The product range includes rock tools, breakers and demolition tools, drilling, loading and hauling, crus
Mining technology - Made in Germany - leading world-wide
CICEME, event, trade show
www.used-crushers.de www.crushers.de ENDERS Crushers + Screens Crushers Jaw crusher single- double-toggle Roller crusher Impact crusher Hammer crusher Cone crusher Ball Tube mill
hoisting technology and mine-shaft infrastructure Siemag Tecberg http://www.siemag-tecberg.com
Thyssen Schachtbau GmbH
http://www.gvst.de
http://www.vge.de
gta, maschinensysteme, tunnelling, mining, roadheading, galleries, driving, support setting, transport, monorail, racks, drilling, bolting
VGE Verlag GmbH - Montebruchstraße 2, D-45219 Essen - Germany - Tel. + 49 (0) 20 54 / 924-0 - Fax + 49 (0) 20 54 / 924-109 - E-Mail: info@vge.de
Layout / Technische Umsetzung: www.denkbetrieb.de - Ihre Full Service Werbeagentur im Ruhrgebiet koordination und abwicklung: moduscom unternehmenkommunikation manfred könig