Banner


Yukon-Nevada Gold Corp. Announces The Recommencement Of Exploration Drilling At Jerritt Canyon Under The Direction Of A New Chief Geologist PDF Print E-mail
Wednesday, 28 July 2010 01:58
Yukon-Nevada Gold Corp. (Toronto Stock Exchange: YNG; Frankfurt Xetra Exchange: NG6 announced that as of July 12, 2010 it has recommenced underground exploration drilling at its gold producing Jerritt Canyon property located 50 miles from Elko, Nevada. In addition the Company is pleased to announce that Mr. William Hofer has been recently appointed as the Chief Geologist at Jerritt Canyon. The Jerritt Canyon Mine is operated by Yukon-Nevada Gold Corp.'s ("YNG" or the "Company") wholly owned subsidiary Queenstake Resources USA, Inc. ("Queenstake").

Mr. Hofer has over twenty three years of precious metals mining and exploration experience and has worked throughout the western United States, Canada and China. He graduated from the University of South Dakota with a Bachelor of Science Degree in Geology. Mr. Hofer has conducted work for INCO Gold/TVX Gold at the Mineral Hill Mine in Montana; Kinross/Candelaria Mining Co. at the Candelaria Mine in Nevada; and Homestake Mining Company at the Lead Mine in South Dakota. He also has significant experience with project management, underground and open-pit mine operations, mine prefeasibility and feasibility studies, mine construction and pre-production development, ore reserves and deposit modeling, and exploration programs. Mr. Hofer's geological experience will greatly benefit the Company as it moves towards expanding its reserves and resources at Jerritt Canyon.

Mr. Hofer, along with Laura Symmes, the Jerritt Canyon Project Geologist, has designed both the 2010 underground and surface drilling programs. The 2010 underground exploration program includes approximately 12 diamond drill holes totaling 14,400 feet.

Plans for a surface exploration drilling program are currently being finalized. This surface exploration program is focusing on the northern half of the property in previously disturbed areas and will include approximately 35,000 feet in over 30 drill holes. The surface exploration drill program is scheduled to start in mid-August.

The goals of the 2010 Jerritt Canyon drill programs include:

• Resource conversion/expansion adjacent to the existing Smith & Steer/SSX Mine underground infrastructure and thereby increasing the current life-of-mine duration of 4 years (at a projected steady-state 150,000 oz Au production per year) by an additional 3 to 4 years;
• Exploration along known resource trends distal to existing underground infrastructure (> 1,000 lateral feet) using wide-spaced drilling;
• New resource discovery targeting the Hanson Creek IV unit in the Winters Creek and Ridge fault zone areas; and
• Evaluation of areas of historic surface production in the Generator pit areas.

The resource conversion drill holes will target Zones 4, 5, and 8 near the Smith Mine and the West Mahala resource located southeast of the existing SSX-Steer mine complex workings. Exploration drill holes will focus on expanding resources in the following areas: West Mahala, East Dash, and Coulee (Zones 1, 3, 4 and 8 at Smith Mine).

The 2010 underground and surface drilling programs are designed to provide continuing production from the existing mines and continue to extend the longevity of Jerritt Canyon. Future exploration programs within the 119 square mile Jerritt Canyon property will be undertaken with the objective of discovering new gold mines.

The current Smith mine plan has a scheduled life that extends at least into 2014. A 2.5-year mine design on the Steer-SSX underground mine complex is mostly completed.
Bookmark this page!
Ask.com del.icio.us Digg.com Facebook folkd.com Google Hao Hao Report Netscape StumbleUpon Technorati Webnews Mister Wong Yahoo

Last Updated on Wednesday, 28 July 2010 00:01
 



Stay informed, receive our monthly newsletter!

We have 831 guests online

Mining Reporter Portal - The International Journal for Mining, Tunnelling, Equipment and Technology - Made in Germany
Cool Air and a Fresh Breeze in Mining and Tunnelling - We care for You - Herco-gmbh.com
Hauhinco Maschinenfabrik machine works, engineering works, pumps, high-pressure pumps, plunger pumps, water hydraulics, water-hydraulics, extruding machine, hydraulic extruder, pumps for mining, pumps
Tools for drilling and rockbolting Drill bits Drill rods Drill shanks Drag bits Sleeves and adapters
http://www.hese.de
Cool Air and a Fresh Breeze in Mining and Tunnelling - We care for You - Tunnel-Ventilation.de
http://www.gvst.de
http://www.vge.de
Self-propelled working platform and standard telescopic-swivel loader combined in one machine
Spezialmaschinen und Komponenten fuer Anwendungen im Berg- und Tunnelbau
A world-leading provider of equipment and services for the mining and construction industries. The product range includes rock tools, breakers and demolition tools, drilling, loading and hauling, crus
MEYCO Global Underground Construction - part of BASF Construction Chemicals
Thyssen Schachtbau GmbH
gta, maschinensysteme, tunnelling, mining, roadheading, galleries, driving, support setting, transport, monorail, racks, drilling, bolting
http://www.dh-shaftsinking.com
tunnel construction boring machine tunnelling  shaft sinking machines drilling horizontal mechanized Schwanau traffic
WOELKE - Monitoring and measuring devices for coal mines (ventilation/concentration sensor, transmitter, monitor, alarm) - Mining Security Made in Germany
www.used-crushers.de www.crushers.de ENDERS Crushers + Screens Crushers Jaw crusher single- double-toggle Roller crusher Impact crusher Hammer crusher Cone crusher Ball Tube mill
http://www.cft-gmbh.de
http://www.kirchgaesser.de
Becker Mining Systems Energy Distribution Automation Communication Transportation Roof Support
PC-Soft GmbH is positioning itself on the market as one of the first and leading providers of integrated software
http://www.bucyrus.com
http://www.akersolutions.com/wirth
http://www.dmt.de
http://www.indurad.com
http://www.thiele.de
vge-strata-control-in-in-seam-roadways german deep coal mining expertise
http://www.preinfalk.de
http://www.emp-antriebstechnik.de
VGE Verlag GmbH - Montebruchstraße 2, D-45219 Essen - Germany - Tel. + 49 (0) 20 54 / 924-0 - Fax + 49 (0) 20 54 / 924-109 - E-Mail: info@vge.de
Layout / Technische Umsetzung: www.denkbetrieb.de - Ihre Full Service Werbeagentur im Ruhrgebiet koordination und abwicklung: moduscom unternehmenkommunikation manfred könig